3M Products & Supplies

3M™ Scotch-Weld™ Epoxy Adhesive 125, Gray, Part A, 5 Gallon (Pail), Drum - 7100320285

Sold As: 5-Pack
SKU: 7100320285
MPN: 7100320285
Made to Order: For a lead time estimate, please send your request to [email protected]
UPC: 50068060756621
3M ID: 62339385312
$51,998.58 ($10399.72 / Count)
Hurry up! Current stock:

Product Description

3M™ Scotch-Weld™ Epoxy Adhesive DP125 is a low odor, two-part epoxy structural adhesive that creates strong and flexible bonds on metal, ceramics and many plastics where coefficients of thermal expansion are a consideration. This versatile adhesive can be used in joining, gluing and structural bonding in appliance, general industrial, transportation and signage segments. It applies easily and flows smoothly for controlled dispensing that minimizes dripping, running and migration. The 1:1 mix ratio is ideal for bulk mixing, and with 25 minutes of work-life, there's ample opportunity to reposition. This adhesive reaches handling strength in approximately 150 minutes and is fully cured in 7 days at 72 °F (22 °C). When using this, or other Duo-Pak (DP) size adhesives, rely on 3M™ Applicators for convenient and accurate metering, mixing, and dispensing.

Features

  • FULL CURE TIME: Fully cured in 7 days at a temperature of 73 °F (23 °C)
  • TOLERATES THERMAL EXPANSION: Maintains a strong bond under expansion, contraction, and limited movement
  • TIME TO ADJUST: Allows up to 25 minutes of open working time to reposition the project
  • A VARIETY OF INDUSTRIES: Offers secure bonding in transportation, metalworking, signage, specialty vehicle, electronics, construction, and many more
  • VARIOUS APPLICATIONS: For metal, ceramics, stone, wood, and many plastics
  • FOR CHALLENGING APPLICATIONS: Provides a secure bond on dissimilar surfaces
Spec Sheet

 

Downloads

Specifications

Shelf Life730
Application Temperature To (Celsius)80.0
Adhesive TypeEpoxy
Container Size (Metric)18.93 L
Application Temperature To (Celsius) UOMDegree
Country of OriginUnited States
Design ChallengesImpact & Shock Absorption
Full Cure Time7 days
Set Time2.5 hr
Application Temperature From (Celsius)-55.0
Container Size (Imperial)5.0 gal
ApplicationBonding; Impact Resistance
Application Temperature From (Celsius) UOMDegree
Specifications MetUL 94 HB

Customers Also Viewed